Pemasangan AC
No Tanggal Uraian Masuk (Rp) Keluar (Rp)
1 05/02/2026 Diterima Dari Bendahara Via Transfer BSI ZIS 25.000.000 -
2 06/02/2026 AC Daikin 1PK STC25YV STD INA 5 Unit - 22.950.000
3 06/02/2026 Pipa 1PK Tateyama 1/4x3/8 10 meter - 1.000.000
4 06/02/2026 Bracket 1PK-1,5PK DADO - 65.000
5 06/02/2026 DTL Tebal 3 roll - 45.000
6 06/02/2026 Diterima Dari Bendahara Cash 3.500.000 -
7 07/02/2026 Supreme NYM 3x2.5 50 meter - 1.178.000
8 07/02/2026 National Isolasi 2 pcs - 14.000
9 07/02/2026 Electra Klem 12 inc 1 Pack - 8.000
10 08/02/2026 GRC Board 4 lbr - 254.000
11 08/02/2026 Master Glass 1,2 2,5m - 135.000
12 08/02/2026 Drywall 6x1 200pcs - 30.000
13 08/02/2026 Fischer 6s 2 Dus - 15.000
14 08/02/2026 Cat Aries Gold 1kg - 26.000
15 08/02/2026 Kuas 3' - 12.000
16 08/02/2026 Cat Aries Gold 1kg - 26.000
17 08/02/2026 MCB Schneider C10 3 bh - 240.000
18 08/02/2026 Konsumsi Pasang Ac - 37.500
19 09/02/2026 Supreme NYM 3x2.5 25 meter - 620.000
20 09/02/2026 Electra Klem 12 inc 2 Pack - 14.000
21 09/02/2026 Konsumsi Pasang Ac - 53.500
22 10/02/2026 Konsumsi Pasang Ac - 87.000
23 10/02/2026 Jasa Pasang AC 5 Unit dan Instalasi Listrik AC - 1.650.000
24 12/02/2026 Diterimas Dari Bendahara Via Transfer BSI ZIS 1.400.000 -
25 15/02/2026 Master Glass 1,2 8,5m - 459.000
26 15/02/2026 Master Glass 1,2 0,5m - 27.000
27 15/02/2026 Staples T10 - 21.000
28 15/02/2026 Konsumsi - 65.500
29 15/02/2026 Roda Pintu Sliding - 77.000
Total Pekerjaan 29.900.000 29.109.500